Industrial plant dismantling & shipping

From 3D plantto load plan.

NEXUS reads your plant drawings, groups parts by TAG, decides what to dismantle and works out how many containers you need — every decision recorded and reversible.

Native DWGno AutoCAD required
Plant 3D · CADWorxTAG, line and design weight
3D in the browserwhole plant and every container
Exceldismantling roadmap
Features

Built for teams that dismantle and ship entire plants.

Not a box calculator: NEXUS starts from the engineering drawing and ends at the shipping plan.

Native DWG reading

Imports DWG with external references, Plant 3D objects and CADWorx components without AutoCAD. Every part's real geometry shows in 3D.

TAG assemblies

Parts are grouped by line or equipment. Accept a whole assembly as one dismantling unit instead of checking part by part.

Automatic cutting

When an assembly doesn't fit, NEXUS separates only the joints it must — flanges first, welds last — and suggests transverse cuts when needed.

Bundles & stacking

Similar pipes go into cradled bundles with dunnage; flagged parts can be stacked. Plans use the container's height, not just its floor.

Every plan validated

Payload per container, door clearance, allowed orientation, support and layers: the validator checks every position before showing a result.

Roadmap & exports

Excel dismantling roadmap by TAG, break-bulk list for quotes and a CSV parts review.

How it works

Three steps from drawing to shipment.

Import the drawings

Upload the plant DWG (with XREFs) and, if available, the Plant 3D database. NEXUS identifies parts, TAGs, lines and weights.

Review assemblies

Check weights and sizes by TAG, accept assemblies, cut what doesn't fit and choose flat rack or break bulk when needed.

Plan and export

Pick the containers, compute the load, review it in 3D and export the dismantling roadmap and shipping lists.

Case study · simulation

Ethanol distillery: from 6 to 2 containers.

In a pilot distillery relocation, the first plan needed six 20' Open Top containers. After correcting pipe weights, bundling pipes and switching to 40' units, the same cargo fit into two 40' Open Top containers.

Simulation result in NEXUS; always confirm with your shipping team.
6First plan
2Revised plan
Who it's for

For teams that move plants.

Project engineering

Relocation, decommissioning or resale of industrial plants.

Project logistics

Container, flat rack and break-bulk quotes backed by drawing data.

Dismantling & erection

Roadmap by TAG: what goes together, what to separate and where it goes.

Start with the drawing you already have.

Log in and import your first DWG.